Thesis:
Comparación de estrategias de resolución de problemas de control predictivo basado en modelos económicos en un sistema experimental.

datacite.subject.fosNatural sciences::Chemical sciences
datacite.subject.fosNatural sciences::Mathematics::Applied mathematics
datacite.subject.fosNatural sciences::Computer and information sciences
datacite.subject.fosEngineering and technology::Electrical engineering, Electronic engineering, Information engineering::Automation and control systems
datacite.subject.fosEngineering and technology
dc.contributor.correferenteDiaz Alvarado, Felipe (Universidad de Chile)
dc.contributor.correferenteBriceño Arias, Luis Manuel
dc.contributor.departmentDepartamento de Ingeniería Química y Ambiental
dc.contributor.guiaNavia Lopez, Daniel Andres
dc.coverage.spatialCampus Casa Central Valparaíso
dc.creatorBravo Lunas, Jesús Felipe
dc.date.accessioned2025-09-09T14:20:27Z
dc.date.available2025-09-09T14:20:27Z
dc.date.issued2018-06
dc.description.abstractActualmente existe una sección en la ingeniería aplicada al control de procesos industriales en la que no se pueden utilizar las estrategias usuales de resolución de problemas de optimización en tiempo real o con una frecuencia de actualización de decisiones (o entrega de soluciones) tan rápida como se necesita. Básicamente, existe una cantidad de problemas que no pueden ser resueltos en un periodo de tiempo que requiere alguna de las capas de optimización y a este tipo de problemas se les llama de gran escala. En este trabajo se presentan dos problemas históricos, los que resultan ser de gran escala al intentar resolverlos. El primero es el problema de redes de distribución de recursos compartidos, en el que distintas unidades de proceso compiten por el uso de recursos para lograr llegar a consignas impuestas por capas superiores. El segundo problema es uno de optimización estocástica en dos etapas, donde la calidad de la materia prima de una unidad de proceso es desconocida, pero se conoce información estadística-histórica acerca de esta. Para tratar estos problemas se propone la comparación de tres metodologías, dos de las cuales modifican el enfoque jerárquico usual y agregan una capa de optimización extra, mientras que la tercera intenta resolver el problema en su forma original. Las primeras dos metodologías, llamadas clipping y Lagrangiano aumentado, modifican el problema transformándolo en una cantidad mayor de problemas más pequeños (o que consideran menos información), los que son resueltos de forma iterativa, controlados por la capa de coordinación para asegurar su convergencia. La tercera metodología se basa en el uso del operador matemático de “proyecciones” intercalado con pasos de gradiente, los que bajo restricciones controladas prometen la convergencia de los resultados.es
dc.description.abstractCurrently, there is a section within engineering applied to industrial process control where the usual strategies for solving optimization problems in real time, or with the rapid decision update frequency (or solution delivery) required, cannot be used. Essentially, there are a number of problems that cannot be solved within the timeframe required by any of the optimization layers, and these are called large-scale problems. This paper presents two historical problems that turn out to be large-scale when attempts are made to solve them. The first is the shared resource distribution network problem, in which different process units compete for the use of resources to meet setpoints imposed by higher layers. The second problem is a two-stage stochastic optimization problem, where the quality of the raw material for a process unit is unknown, but statistical and historical information about it is available. To address these problems, a comparison of three methodologies is proposed. Two of these modify the usual hierarchical approach and add an extra optimization layer, while the third attempts to solve the problem in its original form. The first two methodologies, called clipping and augmented Lagrangian, modify the problem by transforming it into a larger number of smaller problems (or problems that consider less information), which are solved iteratively, controlled by the coordination layer to ensure convergence. The third methodology is based on the use of the mathematical operator of "projections" interspersed with gradient steps, which, under controlled constraints, promise convergence of the results.en_US
dc.description.degreeMagíster en Ciencias de la Ingeniería Química
dc.description.sponsorshipANID FONDECYT INICIACION 11160203
dc.description.sponsorshipUNIVERSIDAD TECNICA FEDERICO SANTA MARIA
dc.driverinfo:eu-repo/semantics/masterThesis
dc.format.extent44 páginas
dc.identifier.doi10.71959/e3vx-g493
dc.identifier.urihttps://cris.usm.cl/handle/123456789/4052
dc.identifier.urihttps://doi.org/10.71959/e3vx-g493
dc.language.isoen
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internationalen
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectproblemas de gran escala
dc.subjectdistribucion de recursos
dc.subjectoptimizacion estocastica
dc.subjectsistema benchmark
dc.subjectcapa de coordinacion
dc.subjectclipping
dc.subjectlangrangiano aumentado
dc.subjectproyecciones
dc.subject.ods7 Energía asequible y no contaminante
dc.subject.ods9 Industria, innovación e infraestructura
dc.subject.ods12 Producción y consumo responsables
dc.subject.ods8 Trabajo decente y crecimiento económico
dc.subject.ods13 Acción por el clima
dc.titleComparación de estrategias de resolución de problemas de control predictivo basado en modelos económicos en un sistema experimental.
dspace.entity.typeTesis

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
MC_JB_2018.pdf
Size:
1.69 MB
Format:
Adobe Portable Document Format