Repository logo
Acerca de Depósito
  • Español
  • English
Log In
  1. Home
  2. Productividad Cientifica
  3. Articulos DGIIE 2021-2026
  4. A Stochastic Formulation for the Dig-Limit Definition Problem in Short-Term Mine Planning Under Grade Uncertainty
 
  • Details

A Stochastic Formulation for the Dig-Limit Definition Problem in Short-Term Mine Planning Under Grade Uncertainty

Date Issued
2026-12
Author(s) USM
Manriquez, Fabian  
Nelis, Gonzalo  
DOI
10.3390/math14010141
Abstract
Uncertainty in short-term grade estimations can significantly affect destination policies and dig-limit definitions in open-pit mining. However, most dig-limit techniques still rely on deterministic methods and manual procedures. This study proposes a sto
Link
https://doi.org/10.3390/math14010141
https://cris.usm.cl/handle/123456789/6925
Subjects

Dig-Limit Optimizatio...

Short-Term Planning

Uncertainty

UNIVERSIDAD

  • Nuestra Historia
  • Federico Santa María
  • Definiciones Estratégicas
  • Modelo Educativo
  • Organización
  • Información Estadística USM

CAMPUS Y SEDES

  • Información Campus y Sedes
  • Tour Virtual
  • Icono Seguridad Política de Privacidad

EXTENSIÓN Y CULTURA

  • Dirección de Comunicaciones Estratégicas y Extensión Cultural
  • Dirección General de Vinculación con el Medio
  • Dirección de Asuntos Internacionales
  • Alumni
  • Noticias
  • Eventos
  • Radio USM
  • Cultura USM

SERVICIOS

  • Aula USM
  • Biblioteca USM
  • Portal de Autoservicio Institucional
  • Dirección de Tecnologías de la Información
  • Portal de Reportes UDAI
  • Sistema de Información de Gestión Académica
  • Sistema Integrado de Información Argos ERP
  • Sistema de Remuneraciones Históricas
  • Directorio USM
  • Trabaja con nosotros
Acreditación USM
usm.cl
Logo Acceso
Logo Consejo de Rectores
Logo G9
Logo AUR
Logo CRUV
Logo REUNA
Logo Universia

DSpace software copyright © 2002-2026 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback